Difference: CCPiFlagship (12 vs. 13)

Revision 1313 Jun 2017 - MartinTurner

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

FLAGSHIP - Initial pre-kickoff meeting and CCP core integration process: plus follow-on meetings

Introductions and roles of related participants.

Line: 31 to 31
 

Presentations CCPi Flagship Grant: Phil Withers

Changed:
<
<
>
>
 
Line: 102 to 102
 
  • Savu uses MPI for parallelization. At Diamond each MPI process uses a separate GPU (exclusive access). GPU can be set to non-exclusive access mode, and Savu allows different processes to access same GPU. Hence many smaller GPUs not necessary (in practice having more than four in a workstation is difficult).
  • Possibly best trade-off: Two mid-range GPUs instead of one high-end. Would probably allow same or more FLOPs with same budget, and allows to experiment with multi-GPU use, relevant for massively scaling up on SCARF/Emerald clusters with many GPUs.
  • In the end, unclear whether decision was to still wait a bit for some Savu tests to happen in the next months before acquiring workstations, or given that workstations will be only for proof of concept, can proceed to acquire soon.
Changed:
<
<
  • Would be good to get ISIS-IMAT datasets soon to experiment with. Winfried Kochelmann has offered access during the current commissioning time for us to acquire data sets. Timing good before fall when users start coming.
>
>
  • Would be good to get ISIS-IMAT datasets soon to experiment with: Winfried Kochelmann has offered access during the current commissioning time for us to acquire data sets. Timing good before fall when users start coming.
  Cone-beam in Savu:
Line: 121 to 121
 

Meeting at Working Grop and workshop: 12-13 June 2017

Changed:
<
<
Presntations given:
>
>
Presentation given:
 
Changed:
<
<
>
>
  Discussed items:
Changed:
<
<
  • Images and ppt for flagship
  • Website update - tab on main site.
  • submission for ToScA 2017
  • leaflets/poster etc
  • Phantom: Andy King at soleil and psiche beamline.
>
>
  • Workstation - single larger machine based in Manchester to be purchased; action for quotes.
    • JADE (GPU cluster) login etc to be investigated MT
  • Images and ppt for flagship - uploaded
  • Datasets:
    • ISIS/IMAT; Genovere meeting to be organised DK (aim for scan time before Xmas)
      • Crab data set - XCT and Neutron tomography RG/IO
      • Kate Dobson at Durham to be contacted JJ/MT
    • Manchester hand-over for system in HMXIF JJ
  • Website update - tab on main site
    • Move twiki information to drupal site (MT)
  • Submission for ToScA 2017
  • Leaflets/poster etc to be redone.
    • update leaflet etc
  • Phantom: Andy King at soleil and psiche beamline. (MT to contact)
  • VR graduate student May-August: working with SN.
  • Management meeting to be arranged early September: every three months.
  -- MartinTurner - 24 Mar 2017
 