Difference: CCPiFlagship (13 vs. 14)

Revision 1414 Jun 2017 - MartinTurner

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

FLAGSHIP - Initial pre-kickoff meeting and CCP core integration process: plus follow-on meetings

Introductions and roles of related participants.

Line: 13 to 13
 
Changed:
<
<
  • Next Techy-Admin meeting (t-conf: 11 May 2017, informal at Working Group/Fringe 12/13 June 2017)
>
>
  • Next Techy-Admin meeting (t-conf: 11 May 2017, informal at Working Group/Fringe 12/13 June 2017, next planned for September)
 
Line: 119 to 119
 
  • Are Python data readers for Zeiss and Nikon cone-beam data already available in CCPi core library? If yes, are or can they be easily used from within Savu?
  • How (and when) to confirm availability to us of SCARF/Emerald clusters; how to initiate the scaling-up work?
Changed:
<
<

Meeting at Working Grop and workshop: 12-13 June 2017

>
>

Meeting at Working Grop and workshop: 12-13 June 2017; SN, JJ, DK, MT, EP

  Presentation given:
Line: 127 to 127
  Discussed items:
Changed:
<
<
  • Workstation - single larger machine based in Manchester to be purchased; action for quotes.
>
>
  • Workstation - single larger machine based in Manchester to be purchased; action for quotes (DK, JJ)
 
    • JADE (GPU cluster) login etc to be investigated MT
  • Images and ppt for flagship - uploaded
  • Datasets:
    • ISIS/IMAT; Genovere meeting to be organised DK (aim for scan time before Xmas)
      • Crab data set - XCT and Neutron tomography RG/IO
      • Kate Dobson at Durham to be contacted JJ/MT
Changed:
<
<
    • Manchester hand-over for system in HMXIF JJ
  • Website update - tab on main site
    • Move twiki information to drupal site (MT)
  • Submission for ToScA 2017
>
>
    • Manchester hand-over for system in HMXIF - JJ to monitor and extract new test data
  • Website update - tab on main site done but needs tidying up
    • Move twiki information to drupal site (SN/MT)
  • Submission for ToScA 2017 - done
 
  • Leaflets/poster etc to be redone.
Changed:
<
<
    • update leaflet etc
>
>
    • update leaflet etc (SN to send around doc)
 
  • Phantom: Andy King at soleil and psiche beamline. (MT to contact)
Changed:
<
<
  • VR graduate student May-August: working with SN.
  • Management meeting to be arranged early September: every three months.
>
>
  • VR graduate student is in RAL May-August: working with SN.
  • Management meeting to be arranged for early September: then every three months.
  -- MartinTurner - 24 Mar 2017
 
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright & by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback